|
Warning: main(/www/amanah.com/en/page_left.php) [function.main]: failed to open stream: No such file or directory in D:\inetpub\vhosts\amanah.com\httpdocs\en\company\network.php on line 37 Warning: main() [function.include]: Failed opening '/www/amanah.com/en/page_left.php' for inclusion (include_path='.;./includes;./pear') in D:\inetpub\vhosts\amanah.com\httpdocs\en\company\network.php on line 37 |
Amanah Tech's headquarters are located at 151 Front Street West in Toronto, Canada. This building is widely recognized as the pre-eminent telecommunications carrier hotel and data center facility in Canada.
151 Front Street is the choice of more than 150 telecommunication and technology companies
151 Front is at the heart of every major provider's network. Home in some way to all facilities based telecommunications carriers in Canada, 151 Front boasts unparalleled network connectivity. Because of the over 25 fibre optic entrances into 151 Front, network diversity and business continuity are ensured.
The building is surveyed by uniformed security surrounding the area 24/7/365. In addition, 151 Front Street is monitored by such systems as card readers, alarm management, recording of data and comprehensive reporting capabilities as well as photo identification system. There are over 50 closed circuit television cameras located throughout the building monitoring all areas of importance continuously.
By connecting only with globally based Tier 1 Internet providers, public Network Access Points, as well as hundreds of peering partners worldwide, Amanah Tech delivers unsurpassed network performance. The best in the business, our highly skilled engineers and dynamic Network Operations Centre staff optimize your Internet performance 24/7/365. A reliable source of primary power is of paramount important to the 24/7/365 operation at Amanah Tech. Two 4000/5000KVA transformers ensure the reliability of Amanah Tech's power supply. These transformers are fed by dual underground 13.8 Kv feeder lines from the local substation. Reliability is further enhanced by a substation design that uses two double winding transformers to supply a double breaker, double bus configuration. Redundancy is again amplified by Amanah Tech's use of a state-of-the-art diesel generator for emergency back-up power. Climate conditions at Amanah Tech's headquarters are controlled by a dual cooling system, ensuring constant reliable cooling. The first part is a district cooling system providing the main source of cooling, and the second part is a 325 tonne centrifugal chiller on 15-minute standby for any supplemental cooling needs. |